What bird netting costs, what drives the price, and how to compare two quotes
There is no fixed per-square-metre price for bird netting, because the real cost comes from reaching the work rather than from the material. Two buildings of the same area can differ twofold once height and access are taken into account. This article sets out the six factors behind the price, and how to read two quotes whose numbers do not match.
The first question almost everyone asks is what it costs per square metre. It is a question we cannot answer straight, not because we are holding something back, but because that number does not exist.
The reason is simple. Most of the cost of a bird netting job is not the net. It is getting people and equipment up to where the work is.
Six factors that move the price
1. Height and how the team reaches the work
This one matters most. A job you can scaffold and a job that needs a boom lift or a crane are two different things, and the rental cost of that access is usually a large share of the price of any work at height.

A factory roof structure 12 metres up and the gap under the eaves of a two-storey house can take the same net, but the price per square metre will never be the same.
2. The area to be covered
The larger the area, the lower the price per square metre tends to be, because the cost of access is spread across more of it. Very small jobs therefore cost more per unit than people expect.
3. The type of net the site calls for
PP netting suits ordinary buildings — housing, condominiums and commercial premises where conditions are not harsh.
HDPE netting is tougher and more corrosion-resistant. It is used in heavy industry and anywhere there are chemical fumes, salt air or sustained high heat, because it is made not to turn brittle and tear in those conditions.
The two cost different amounts, and choosing the wrong one wastes money either way. Over-specify and you pay for strength you do not need; under-specify and you are doing the job again before you should be.
4. The condition of the structure being fixed to
If the existing structure already has fixing points that can be used, the job finishes quickly. If fixing points have to be added, both materials and labour go up.
Flaking paint or crumbling render is another case, because the surface has to be prepared before anything will hold properly.
5. How much droppings there are to clear first
Where droppings have built up, they are always cleared and the area disinfected before installation. Ten years of build-up and a problem that started recently take very different amounts of time, even over the same area.
The useful part is that this work costs far less when it is done together with the installation, because the same team is already up there and the access only has to be set up once.
6. Restrictions on when the work can happen
Work that can only be done during a production shutdown, at night or at the weekend costs more than work in normal hours. And if only a few hours a day are available, the overall schedule stretches out to match.
Why two quotes can be so far apart
When two quotes come back with very different numbers, the cause is usually one of four things.
- They are not the same net. One quotes PP and the other HDPE, and both simply say "bird netting".
- They do not assume the same access. One has priced a boom lift; the other intends to use ladders, which may not be safe enough for that site.
- One excludes clearing the droppings, which then comes back as an extra once the team is on site.
- The scope is not the same. One closes the main openings; the other closes every opening including the small corners, which are the gaps birds actually use.
What a good quote should state
- The type and grade of net, not just the words "bird netting"
- The area or length to be covered, as a figure
- How the team will reach the work
- Whether clearing droppings and disinfection are included, stated plainly
- How long the work will take and when it will be carried out
- What the warranty covers and what it excludes
If two quotes state all six, you can genuinely compare them and see what the difference is paying for.
Work out the cost per year
Netting and spikes from Accept Environment last 8 to 10 years, where other companies' last only 1 to 2 years. Service life is what matters most. Some quotes come in low because the installation does not last: 320 baht per square metre, replaced after 1 to 2 years, against Accept Environment at 380 baht lasting 8 to 10 years before replacement. Compared that way, Accept Environment's netting is considerably cheaper across its life. And paying to clear droppings every year without installing any protection usually costs more over several years than installing it once.
How to get the most accurate price
Send photographs of the area first — taken from the ground is fine. It speeds up an initial assessment and means the right access equipment is arranged from the start.
Building drawings or a roof plan help even more, because the area can be calculated before anyone goes up to measure.
A price we can stand behind, though, has to come from a site survey, and that is free. Book a visit and we can be there within one working day. Where a spot is hard to reach on foot, we survey it by drone. Service available nationwide.
Common questions about price
Can you give a rough price over the phone?
We can give a broad range if there are photographs and a size. We do not confirm a price over the phone, because a figure that far out does not help you decide and usually turns into a problem once the team arrives.
Do you take small jobs?
We do the work to the same standard whatever the size.
Can the work be split into phases?
Yes, and many factories do it this way, starting with whatever is causing the most trouble — above a production line or a raw-material store — and extending from there. It is still worth having the whole building surveyed first, so the order of work makes the most of the budget.
Does the price include tax?
It is stated on every quote, along with payment terms and how long the price is held.
Let us survey your site before you decide
Request a quotation